All steel manufactured by Steelco must meet the following requirements: 3.2–3.5% carbon; 1.8–2.5% silicon; 0.9–1.2% nickel; tensile strength of at least 45,000 pounds per square inch (psi). Steelco manufactures steel by combining two alloys. The cost and properties of each alloy are given in Table.

Alloy 1 Alloy 2
Cost per ton ($) $190 $200
Percent silicon 2 2.5
Percent nickel 1 1.5
Percent carbon 3 4
Tensile strength (psi) 42,000 50,000

Assume that the tensile strength of a mixture of the two alloys can be determined by averaging that of the alloys that are mixed together. For example, a one-ton mixture that is 40% alloy 1 and 60% alloy 2 has a tensile strength of 0.4(42,000) + 0.6(50,000).

Use linear programming to determine how to minimize the cost of producing a ton of steel.

Solution:

Looking for help with your homework?
Grab a 30% Discount and Get your paper done!

30% OFF
Turnitin Report
Formatting
Title Page
Citation
Place an Order

Calculate your paper price
Pages (550 words)
Approximate price: -