The Boeing Company, headquartered in Chicago, Illinois, is one of the two major producers of aircraft in the global market. The other major producer is European Airbus. Boeing produces three models in Everett, Washington: 747s, 767s, and 777s. The planes are all produced in the same building. At any one time, there may be as many as six planes in various stages of production. Obviously, the building has to be fairly large to accommodate such a huge undertaking. In fact, the building is so large that it covers over 98 acres and it is four stories high, making it the largest building by volume in the world. It is so large that all of Disneyland would fit inside, and still leave about 15 acres for indoor parking! The windowless building has six huge doors along one side, each about 100 yards wide and 40 yards high (the size of a football field)—large enough to allow a completed airplane to pass through. Boeing sells airplanes to airlines and countries around the globe. There isn’t a set price for the planes; the actual price depends on what features the customer wants. Once the details have been settled and an order submitted, the customer requirements are sent to the design department. Design Designers formerly had to construct a mock-up to determine the exact dimensions of the plane and to identify any assembly problems that might occur. That required time, materials, labor, and space. Now they use coAAAAAAAA, avoiding the cost of the mockups and shortening the development time.
The Production Process Once designs have been completed and approved by the customer, production of the plane is scheduled, and parts and materials are ordered. Parts come to the plant by rail, airplane, and truck, and are delivered to the major assembly area of the plane they will be used for. The parts are scheduled so they arrive at the plant just prior to when they will be used in assembly, and immediately moved to storage areas close to where they will be used. Time-phasing shipments to arrive as parts are needed helps to keep inventory investment low and avoids having to devote space to store parts that won’t be used immediately. There is a tradeoff, though, because if any parts are missing or damaged and have to be reordered, that could cause production delays. When missing or defective parts are
discovered, they are assigned priorities according to how critical the part is in terms of disruption of the flow of work. The parts with the highest priorities are assigned to expediters who determine the best way to replace the part. The expediters keep track of the progress of the parts and deliver them to the appropriate location as soon as they arrive. In the meantime, a portion of the work remains unfinished, awaiting the replacement parts, and workers complete other portions of the assembly. If the supplier is unable to replace the part in a time frame that will not seriously delay assembly, as a last resort, Boeing has a machine shop that can make the necessary part. The partially assembled portions of the plane, and in later stages, the plane itself, move from station to station as the work progresses staying about five days at each station. Giant overhead cranes are used to move large sections from one station to the next, although once the wheel assemblies have been installed, the plane is towed to the remaining stations. Finished planes are painted in one of two separate buildings. Painting usually adds 400 to 600 pounds to the weight of a plane. The painting process involves giving the airplane a negative charge and the paint a positive charge so that the paint will be attracted to the airplane. Testing and Quality Control Boeing has extensive quality control measures in place throughout the entire design and production process. Not only are there quality inspectors, individual employees inspect their own work and the work previously done by others on the plane. Buyers’ inspectors also check on the quality of the work. There are 60 test pilots who fly the planes. Formerly planes were tested to evaluate their flight worthiness in a wind tunnel, which required expensive testing and added considerably to product development time. Now new designs are tested using a computerized wind tunnel before production even begins, greatly reducing both time and cost. And in case you’re wondering, the wings are fairly flexible; a typical wing can flap by as much as 22 feet before it will fracture. Re-engineering Boeing is re-engineering its business systems. A top priority is to upgrade its computer systems. This will provide better links to suppliers, provide more up-to-date information for materials management, and enable company representatives who are at customer sites to create customized aircraft design on their laptop computer. Another aspect of the re-engineering involves a shift to lean production. Key goals are to reduce production time and reduce inventory.
Boeing wants to reduce the time that a plane spends at each work station from 5 days to 3 days, a reduction of 40 percent. Not only will that mean that customers can get their planes much sooner, it will also reduce labor costs and inventory costs, and improve cash flow. One part of this will be accomplished by moving toward late-stage customization, or delayed differentiation. That would mean standardizing the assembly of planes as long as possible before adding custom features. This, and other time-saving steps, will speed up production considerably, giving it a major competitive advantage. It also wants to reduce the tremendous amount of inventory it carries (a 747 jumbo jet has about 6 million parts, including 3 million rivets). One part of the plan is to have suppliers do more pre-delivery work by assembling the parts into kits that are delivered directly to the staging area where they will be installed on the aircraft instead of delivering separate parts to inventory. That would cut down on inventory carrying costs and save time. Boeing is also hoping to reduce the number of suppliers it has, and to establish better links and cooperation from suppliers. Currently Boeing has about 3,500 suppliers. Compare that with GM’s roughly 2,500 suppliers, and you get an idea of
how large this number is.
Answer all the questions:
1- Analyze Boeing strategy in the location selection and layout of the venue where the airplanes are manufactured
2- What is the type of inventory management does Boeing embrace? How does Boeing manage its inventory? Why it is important to manage inventory?
3- Describe and critique the company’s strategy to overcome delays in manufacturing. 4- What other strategies Boeing is planning to implement to cut cycle times?

Don't use plagiarized sources. Get Your Custom Essay on
Inventory management
Just from $13/Page
Order Essay
The Quizlet
Calculate your paper price
Pages (550 words)
Approximate price: -

Why Us

Exemplary Academic Writing Service

At TheQuizlet.com, you are guaranteed of quality service from our professional writers. We maintain consistent communication with customers after placing an order to avoid missing anything that may compromise the quality of delivered work.

Top Writers

Our hiring process is rigorous to maintain the desired quality that has become the core of our business. We expose potential writers to an uncompromising selection process that enables TheQuizlet to pick the best out of the rest. TheQuizlet boasts of a competent team of writers, editors, and professors who work towards accomplishing your goals.

Plagiarism-Free Papers

TheQuizlet has an in-house plagiarism software that lowers the probability of delivering plagiarized papers to our clients. Referencing is guided by the format specified by a customer when placing an order. Our writers are conversant with all referencing formats that include APA, MLA, Chicago, Harvard, and Vancouver among others.

24/7 Customer Support

We understand the importance of effective communication and as such, TheQuizlet has a dedicated customer support department that responds to all client needs. You can easily contact our team through a chat window at the bottom left corner. Additionally, clients can reach us through support’s email or a telephone number available on our contact page. Feel free to contact us at any time and our team of experts will solve all your problems.

Swift Delivery and 100% Money-back Guarantee

When placing an order, ensure that you specify the correct deadline to help our writers work around the provided timeline. At TheQuizlet, we deliver our tasks before the projected deadline to give time for the customer to proofread the work before submission. In the event we cannot deliver a paper on time, we initiate contact with the client to renegotiate a new deadline.

Unlimited and Free Revisions

We urge all our customers to request for a revision whenever they identify a need to amend the paper. Since we understand your concerns, TheQuizlet.com does not charge for revisions. Nonetheless, we encourage customers to be genuine when requesting for revisions.

Try it now!

Calculate the price of your order

Total price:
$0.00

How it works?

Follow these simple steps to get your paper done

Place your order

Fill in the order form and provide all details of your assignment.

Proceed with the payment

Choose the payment system that suits you most.

Receive the final file

Once your paper is ready, we will email it to you.

Our Services

TheQuizlet is a one-stop shop for all your writing needs. We tackle each customer’s needs differently to improve the quality of outcomes and meet your expectations.

Essays

Academic Help Service

TheQuizlet is committed to delivering quality work on time to ensure our clients get the value for their money.

Admissions

Admission Essays and Professional Writing

Admission essays are personal, as opposed to other papers. For this reason, our team will request for any information that will enable them to deliver quality work, which allows you to convince the admissions board on why you should be granted the application.

Reviews

Editing and Proofreading

Our team comprises of qualified researchers, writers, and editors who go through the different papers before delivering them to our clients. Whether your paper is being written from scratch or you want it to be edited, you can trust TheQuizlet for all your needs.

Reviews

Revision Support

After receiving the final draft, you can request for a revision to incorporate various changes that are aligned with your expectations. All our papers are written in line with the latest writing standards.